Results (
English) 1:
[Copy]Copied!
the efficiency of the use of precast concrete in the construction of the building compared with the cost aspect of conservation is able to reduce costs by up to 10%, while in terms of the time aspect is able to reduce construction time up to 50% and the quality of the concrete better compared to the method of accounting.
Being translated, please wait..