The construction in the field should always refer to the image of planning and construction procedures have been approved by COMPANY. All documents, images and data that will be used in the construction must obtain a written consent of the COMPANY during the planning process (engineering) or the implementation phase of construction.
CONTRACTOR will carry out the work according to the scope of work with the management and direct supervision and direction. in order to meet the implementation schedule. quality and costs that have been planned.
The scope of the construction, among others, are sebagal berlkut:
- Installation of stakes in the ground
- Making a means of supporting and control system projects
- Installation of pipelines and perlintasannya (roads, ditches, sungal, etc.)
- Installation of equipment tanks, BOG (Boil of Gas), LNG vaporizer, Metering, Trucks LNG, Cryogenic pipe Support, Water system, intank pump, pig launchers and receivers, pipelines, piping systems, systems electrical, instrumentation, control systems & kornunlkasi, system water reservoirs, and others.
- testing - testing required
- Pre-commissioning, commissioning and start-up aid
- Job mobilization and demobilization
- Job site clearance
- and other jobs in accordance with the scope of work