Results (
English) 2:
[Copy]Copied!
-Leveling the mining road with the unit grader<br>-Perform the watering on the mine path at a discontinuous<br>-Make the policy when the road is slippery due to rain or watering that is too wet, the hauling process is discontinued<br>-Do safety briefing before work<br>-Provides standard Operation Procedure (SOP) on the process of hauling.
Being translated, please wait..
