Results (
English) 1:
[Copy]Copied!
The activity begins at 8 a.m. with prayer beforehand. There are two counselors on duty pt ait to deliver material to us. The first, Mr. djuhaedi as inspector of pt ait. He oversees a mechanic who was doing overhaul manual on engine. And the second, Mr. savaliya, he delivered the material regarding non destructive testing, Ndt a-checking activities on components of the machinery and for checking whether the rift occurred in the component.
Being translated, please wait..
