Results (
English) 1:
[Copy]Copied!
-make dike safety between the unit and the unit Drill Dozer <br>-Give unit training for operators <br>Propagates safety briefings before work <br>-Provide Standard Operation Procedure (SOP) <br>-memasang warning sign at the location of drilling
Being translated, please wait..
