Results (
English) 1:
[Copy]Copied!
The use of prefabricated components in building construction project is divided into two types namely prefabricated factory ready Plug and prefabricated cast in situ. The use of prefabricated components of decisions made on the basis of the initial design of the project. In prefabricated methods of deployment, the key to successful implementation to achieve the desired quality is influenced by the manajamen. Management aspects of lean contruction area aimed at increasing the value and eliminating waste in the environment the project is with the method Just In Time. Through the method just in time, top management policy is required to perform inventory management (Inventory Management) an optimal location in the project. Top management decisions largely determine the quality of the life cycle of a project. The success of a project is determined by the management needs of the materials, equipment, and labor timely and appropriate quality. The decision Just In Time on site construction project is determined from the perception of project manager in project implementation. Things that affect the perception of the project manager in the decision method of just in time is the factor endowments and restricting factors. This factors into consideration is important for the project manager decided the usage of the method Just In Time for prefabricated components in building construction project.
Being translated, please wait..