Kurangnya perencanaan site layout proyek dengan kondisi lingkungan proyek yang terbatas akan menghambat kelancaran aliran pemasangan material dan penumpukan material.
Lack of planning site layout project with a limited project environmental conditions will impede the smooth flow of materials and installation material buildup.
Lack of site layout planning of projects with environmental conditions limited project would hamper the smooth flow of materials and installation of material buildup.