Results (
English) 1:
[Copy]Copied!
As for the results of the research that has been done above shows that the factors of reducing excess transport capacity with the precision of a schedule capable of being the influence of construction company decided Just In Time for the use of prefabricated components. Manufacturer supplier factory in General is not only responsible for the production problems alone but is also responsible for the transportation problem. Prefabricated component materials that enable the JIT is concrete. Concrete volume per truck molen ordered should match. The main consideration in booking volume concrete in each truck/order is not exceeded the maximum bookings and pay attention to the condition of the road route that will be traveled. Based on data obtained from the development of the Town Planning Board (Bappeko) Surabaya, there are way 11,021 roads in Surabaya. Of that number as much as the road of 9,632 is still viable, and damaged roads 1,374 (prorakyat, 2001). Assessing spatial experts, a layer of asphalt used public works agency is far from standard, making it easy for wavy and easily broken if exposed to rain. "The damage to the roads in the city of Surabaya is associated with the load of the vehicle and the payload of the rainy season. So when the road floods continue to pass the heavy vehicles into the streets were damaged "bright Novan Nugroho, head of road maintenance Department of PU Surabaya (surabayanews, 2001).
Being translated, please wait..
