Results (
English) 1:
[Copy]Copied!
we've been doing repairs macadam material by following the existing requirement on acceptance criteria and corresponding structural works at the quarry during the visit. based on that we carry out a joint check together in the following field and we submitted the minutes of the joint check
Being translated, please wait..