Results (
English) 1:
[Copy]Copied!
Applying the method Just In Time on the use of prefabricated components of construction projects done by some reason, see in Figure 4.15. Reasons to become a project manager's decision to apply the method Just In time on the use of prefabricated components is planning from the beginning of the project (64%), the location of the limitations of the project (25%), ran out of funding projects/manage cash flow (4%), and environmental conditions for setting up an efficient time (7%). Planning from the beginning of the project becomes the Supreme reason to decide the method just in time. From the beginning of the project planning is done with appropriate designs for the mature use of prefabricated components which started from the suitability of the forms, the exact delivery time, and quality at the time of installation. So good planning makes the absence of a buildup of excess material at the site of the project, the readiness to receive and post, as well as highly effective for a limited project location. With the method Just In Time according to the project manager is also able to manage time, and set the time. Comparison of the use of conventional methods with methods Just In Time when viewed in terms of profits, according to the project manager of a more profitable method JIT. A percentage of the project manager for the more lucrative of 46%, whereas the opinion that said the same benefit of 42%. For the comparison diagram can be seen in Figure 4.16.
Being translated, please wait..
