Results (
English) 1:
[Copy]Copied!
The opinion of the respondents against Just In Time more in line with the use of prefabricated components ready to install to the location of the project. So that this variable is not appropriate/not valid because the initial cost prefabricated systems are larger compared to the conventional system. According to respondents the existence of mismatch this variable, shown with the lowest mean values. So that these variables are discarded and not used on the stage of the analysis.
Being translated, please wait..
