Results (
English) 1:
[Copy]Copied!
a. the CONTRACTOR can afford to pay the existing workforce in the contract and was able to provide training to workers to have competent in doing gave, in this case the CONTRACTOR required to provide training as follows: the management of HSE, procedures of work, Safety on the streets, health, audit, lnvestigasi, protection of the environment, control aspects of HSE, AK3, awareness/behaviour, working at height, in confined spaces.
Being translated, please wait..
