Results (
English) 1:
[Copy]Copied!
Similarity of meaning of these variables with variables reduces excess transport capacity with the precision of a schedule. By reducing transport capacitythe excess, the purchase was done with limited capacity and resulting in the existence of a reduction in the level of inventory in the location of the project. These variables are discarded because it produces a lower mean values.
Being translated, please wait..
