Results (
English) 1:
[Copy]Copied!
From the above calculation results obtained value F = 0418 count with 0523 significance. As for the table on the significance level of the F 0.05 (95%) with the numerator = 1 and denumarator = 28 is 4,196. so F > F 4,196 tables calculate 0418, and signifkansi 0523 > 0.05. Thus Ho: accepted, the conclusion that the average value of the mean between has not been implemented and has implemented is no difference or the same. Because there is no difference, there is no need to test further with post hoc test. The majority of project managers in construction companies have understood the method Just In Time, though some project managers still exist that have not been implemented. So the need to do further analysis to find out the factors that affect the project manager in deciding method using JIT. These factors are divided into two i.e. the supporters and a barrier. As for the type of the value obtained F preprints count = 0.029 4,030 table F, with the result that the F > F 4,030 tables calculate 0.029, and 0866 > 0.05 significance. Thus Ho = accepted, the conclusion that the average value of the respondents using both methods of preprints is no difference (the same). Environmental activities in one construction project was able to do two prefabricated method according to your needs. It's just that the existence of the two different methods of treatment to support a decision of Just In Time
Being translated, please wait..
