Results (
English) 1:
[Copy]Copied!
This variable is equal to the frequency of the onset of a change of schedule. With the change of an uncertain schedule will result in the initial cost calculation discrepancies with the supplier. These variables are discarded because it produces a lower mean values.
Being translated, please wait..
